last updated: 3rd April 2013, Painting the sky

Safety First

Blog

Site Index

Search

Rocket Gallery

Labs

Where To Buy

10 Challenges

Contact Us

Links

Glossary


Construction Index

Construction - Basic

Body

Ring Fins

Flat Fins

Nozzle

Nosecone

Construction - Advanced

- Robinson Coupling

- Splicing Bottles - Symmetric

- Splicing Bottles - Asymmetric Splice #5

- Reinforcing Bottles

- Side Deployment Parachute Mechanism

- Side Deploy #2

- Mk3 Staging Mechanism

- Multi-stage Parachute Release Mechanism

- Fairings

Construction - Launchers

Gardena Launcher

Clark Cable-tie

Medium Launcher

Cluster Launcher

Launch Abort Valve

Quick Launcher

How It Works

Drop Away Boosters

Katz Stager Mk2.

Katz Stager Mk3.

DetMech

Articles

Recovery Guide

Parachutes

How Much Water?

Flying Higher

Flying Straight

Building a Launcher

Using Scuba Tanks

Video Taping Tips

MD-80 clone

Making Panoramas

Procedures

Burst Testing

Filling

Launching

Recovery

Flight Computer

Servo Timer II

V1.6

V1.5

V1.4

V1.3, V1.3.1, V1.3.2

V1.2

Deploy Timer 1.1

Projects Builds

The Shadow

Shadow II

Inverter

Flight Log Updates

#132 - Painting the sky

#131 -Materials Challenge

#130 - Shadow II CATO

#129 - Inverter Flight

#128 - Projects Update

#127 - Water and pyro

#126 - Hat-trick

#125 - Long Rocket

#124 - Chase, Boom cam

#123 - TV Commercial

#122 - NSWRA Comp day

#121 - Shadow II flights

#120 - ARB flights

#119 - Sydney Observatory

#118 - Polaron G2 flight

#117 - Water and Pyro

#116 - Casual Flights

#115 - Shadow Flights

#114 - Reefing Chutes

#113 - Alternative Fuels

#112 - Looking Up

#111 - HD Cam flights

#1 to #110 (Updates)

 

Site Index

This site index groups the information on this site by various categories.

Indexes

Flight Log Updates

Update Date 

2013

#132 - Painting the sky 30/3/13
#131 - Materials Challenge, Clark cable tie launcher 17/3/13
#130 - Inverter flight and Shadow II CATO 10/2/13
#129 - Inverter and Shadow II flights, splicing 26/1/13
#128 - Projects update, build threads, ANSTO 12/1/13

2012

#127 - Water and Pyro 11/11/12
#126 - Hat-trick 27/10/12
#125 - Long rocket 14/10/12
#124 - Boom and chase cams 9/9/12
#123 - TV Commercial and Servo Timer IIs 23/8/12
#122 - NSWRA Competition day 28/7/12
#121 - Shadow II flights 30/6/12
#120 - ARB flights, improved splices, new launcher 10/6/12
#119 - Sydney Observatory and altimeter flights 28/4/12
#118 - Polaron G2 flights 8/4/12
#117 - Water and Pyro 31/3/12
#116 - Casual Flights 25/2/12
#115 - Shadow Flights 12/2/12

2011

#114 - Reefing Parachutes 4/12/11
#113 - Alternative Fuels 13/11/11
#112 - Looking up 29/10/11
#111 - HD Cam flights 24/9/11
#110 - Polaron G2 - Phase 2 development 7/8/11
#109 - More Polaron G2 flights 30/7/11
#108 - Pan Cam - A different perspective 10/7/11
#107 - Williams, STII production, test flights 25/6/11
#106 - Measuring bottle stretch thrust 22/5/11
#105 - Polaron G2 flight, Axion G2 8/5/11
#104 - Quick Launcher, HD onboard video 22/4/11
#103 - Polaron G2b CATO 10/4/11
#102 - Servo Timer II test flights 29/3/11
#101 - Foam flights 26/2/11
#100 - Polaron G2 first flight 29/1/11
#99 - G2 Nosecone test flights 22/1/11

2010

#98 - Polaron G2 Nosecone and foam flights 27/11/10
#97 - Acceleron V to 864' 30/10/10
#96 - Polaron G2, 2-stage flights 25/09/10
#95 - Parraweena, MAD deployment 28/08/10
#94 - Mk 3. Staging Mechanism 1/08/10
#93 - Polaron G1 & Parachute cam 13/06/10
#92 - Fiberglass Flights 24/04/10
#91 - Fiberglassing pressure vessels 15/04/10
#90 - Acceleron V & Axion IVb to 810' 27/03/10
#89 - Axion IVb and Craig's flight computer 14/03/10
#88 - Dual Deployment Mechansim 27/02/10
#87 - Another Day in the Office 6/02/10
#86 - In-line Parachute Deployment Mechanism 10/01/10
#85 - MicroLab - Mercury switches 10/01/10

2009

#84 - Acceleron V - pressure switch 23/12/09
#83 - Flight testing new splices 13/12/09
#82 - Inflight Water Behaviour & splice tests 31/10/09
#81 - Bits and Pieces 22/10/09
#80 - A Different Perspective 15/9/09
#79 - Acceleron Vb Explosion and Axion V 25/7/09
#78 - Acceleron V first flight 4/7/09
#77 - Acceleron V development progress 27/5/09
#76 - Windy and Acceleron V progress 15/4/09
#75 -(variable nozzle data)  
#74 - Flour Rockets 15/3/09
#73 - Polaron VIb and other crashes 28/2/09
#72 - Fiberglassing and other progress 21/2/09

2008

#71 - FTC Flights 21/12/08
#70 - NSWRA Open Day, Acceleron V, G-Sw. 22/11/08
#69 - FTC Rocket 9/11/08
#68 - Calibrated Static Test Experiments 4/10/08
#67 - Test Stand 21/9/08
#66 - Multi-stage rocket and Pyro rockets 30/8/08
#65 - Baryon II booster and Tachyon V 2/8/08
#64 - Thermal Testing 27/7/08
#63 - Mk2 Katz Stager flight tests 13/7/08
#62 - 15mm Nozzles and CATOs 1/7/08
#61 - Fog and Polaron VI 20/6/08
#60 - Repairs, Testing and Development 19/5/08
#59 - Acceleron IV and Tachyon III to 617' 6/5/08
#58 - Tornado Couplings, 2L splice tests 15/4/08
#57 - Acceleron IV and Polaron IV 29/3/08
#56 - Polaron IV rocket and launcher details 11/3/08
#55 - Polaron IV flights with Gluon boosters 23/2/08
#54 - Splicing bottles & pressure tests 10/2/08
#53 - NSWRA & Polaron IV test flights 31/1/08
#52 - Polaron IV Launcher & Booster Tests 22/1/08
#51 - Katz Stager - Staging mechanism 6/1/08

2007

#50 - Fire and Water, New launch site 13/12/07
#49 - Foam vs. Water-only test flights 20/11/07
#48 - J4IIIb Crash and Foam flights 30/10/07
#47 - Polaron IV development and, hybrid splice 23/10/07
#46 - VISE Glue Tests 11/10/07
#45 - Zero-G Experiments, Altimeter flights, pressure switch 2/10/07
#44 - Foam flights, V1.3.2 test flights 16/9/07
#43 - Hyperon flights, visiting Damo's spaceport 11/9/07
#42 - Hyperon, new flight computers 14/8/07
#41 - Acceleron IIIb and Tachyon II successful flights. 31/7/07
#40 - Acceleron III Rebuilt, burst tests 22/7/07
#39 - Catastrophic failure during test 7/7/07
#38 - Tachyon test flights 24/6/07
#37 - Tachyon sustainer 13/6/07
#36 - Multi-stage progress 27/5/07
#35 - Acceleron III booster 13/5/07
#34 - Vertical Races 6/5/07
#33 - Simultaneous launches & foam flights 21/4/07
#32 - Thrust measurement for CD nozzles 14/4/07
#31 - Thrust measurement rig, thrust data 6/4/07
#30 - Acceleron II Successful Flights - Launch Sound Analysis 31/3/07
#29 - Acceleron II booster development 25/3/07
#28 - Foam flights, 15mm nozzle 11/3/07
#27 - Foam, baffle and burst tests 9/3/07
#26 - Static Fire Tests 24/2/07
#25 - Polaron III, J4 II, Acceleron and more underwater launches 18/2/07
#24 - Underwater launches, new launcher 3/2/07
#23 - Acceleron 27/1/07
#22 - Cluster flights 11/1/07

2006

#21 - Records and Crashes 31/12/06
#20 - Cluster Development 27/12/06
#19 - Repaired J4Y test flights 2/12/06
#18 - New Rocket, good in-flight video 30/11/06
#17 - Flight Computer successful flights 11/11/06
#16 - A Mixed Bag, bursts tests 22/10/06
#15 - Big Rocket, inflight video burst tests 8/10/06
#14 - Experiments 2/10/06
#13 - Development - Getting more serious 25/9/06
#12 - Crashes 27/8/06
#11 - Record Flight 26/8/06
#10 - In-flight video and faulty nozzles 20/8/06
#9 - In-flight video and perfect flights 13/8/06
#8 - Windy and Wet 5/8/06
#7 - More parachutes and new launch site 30/7/06
#6 - Parachutes 9/7/06
#5 - Whistles 2/7/06
#4 - Rocket payloads 25/6/06
#3 - The beach 18/6/06
#2 - Vertical launcher 11/6/06
#1 - First tests and horizontal launcher 4/6/06 

Rocket Elements

Element Tested
- Acceleron staging mechanism Flight
- Air Brakes Flight
- Baffle Flight
- CD nozzle Flight
- Drop away boosters retention Flight
- FTC nozzle Flight
- FTC bulkhead Flight
- Flight Computer Flight
- Guide rail lugs Flight
- Hybrid splice Ground
- Katz Stager Ground
- Katz Stager Mk2. Flight
- Launcher for boosters Flight
- Nosecone construction Flight
- NOAA Flight
- Pressure switch (TDD) Flight
- TDD 2 Flight
- Parachutes Flight
- Pulling out secondary parachute Flight
- Robinson Coupling Flight
- Removable fin assembly Flight
- Reefing ring on parachute Flight
- Side Deployment Flight
- Side Deployment #2 Flight
- Small pressure switch Ground
- Splicing Flight
- Tornado Coupling - 15mm Ground
- Tornado Coupling - 22mm Flight
- Variable Nozzle Ground
- Whistles Flight
- Water as ballast Flight
- Detachment Mechanism (DetMech) Ground
- Launch Abort Valve Ground
- Pressure Switch (PS3) Flight
- In-line Parachute Deployment Mechanism Flight
- Dual Deployment Mechanism Flight
- Tornado Tube flight tests Flight
- Mk3. Staging Mechanism Flight
- MAD Deployment Flight
- Multi-stage parachute deployment Flight
- Jet Foaming Spacer Flight

 

Science and Engineering Data

- Blow-through effect
- Jet Foaming
- Internal Temperature Measurement
- Launch Sound Analysis (Acceleron)
- Water and air thrust analysis
- Foam thrust analysis
- 7mm CD nozzle thrust data
- 9mm CD nozzle thrust data
- Underwater launches ( 1m )
- Underwater launches ( 2 m )
- Burst Tests Results
- Burst Tests Results - #2
- Burst tests under water
- VISE Glue Tests
- Hybrid Splice tests
- Foam vs. Water-only Altimeter Data
- Thermal Testing
- Detailed Thrust Measurement Experiments
- Coupling Thermal Test
- Mercury Switch Flight Experiments
- Fiberglass reinforcing results
- Reefing Parachutes
- Measuring Bottle Stretch thrust
- ARB test flights

Videos

- Frankovka III inflight (day 20)
- J4 crash from 130 meters (day 20)
- First cluster flights (day 22)
- Acceleron launches (day 23)
- Polaron II inflight (day 24)
- Underwater launches (1 meter)
- Polaron III infligtht video (day 25)
- Day 25 highlights
- Underwater launches (2 meters)
- Blowthrough and foam slow motion
- Blow through slow motion
- Internal temperature measurement
- Baffle slow motion detail
- Jet Foaming slow motion detail
- Jet Foaming Fligths (day 28)
- 18.75L Acceleron booster (day 30)
- Thrust measurements (day 31)
- Simultaneous Launches (day 33)
- Vertical water rocket races (day 34)
- Tachyon deployment and staging test
- Tachyon test flights (day 38)
- 2 stage flights -Acceleron IIIb and Tachyon II (day 41)
- Making Robinson Couplings
- Hyperon Flights, Damo's spaceport (day 43)
- Foam Flights, CF V1.3.2 test flights (day 44)
- Zero-G Experiments (day 45)
- Highlights and foam flights (day 48)
- Highlights of foam vs. water only (day 49)
- Highlights Fire and Water (day 50)
- Gluon booster tests (day 52)
- Polaron IV test flights (day 53)
- Splicing Bottles Tutorial
- Polaron IV flights with boosters ( day 55 )
- Pyro rockets at Doonside - NSWRA(day 55)
- Polaron IV Launcher Details
- Polaron IV dummy booster tests
- Acceleron IV and Polaron IV flights over 500' (day 57)
- Acceleron IV and Tachyon to 617' ( day 59 )
- Fog and Polaron VI (day 61)
- 15mm Nozzles and long launch tube (day 62)
- Katz Stager Mk2 ground tests
- Katz Stager Mk2 flight tests (day 63)
- Thermal Testing (day 64)
- Baryon II booster and Tachyon V sustainer (day65)
- Variable Nozzle
- Multi-stage highlights (day 66)
- NSWRA pyro rocket highlights (day 68)
- Calibrated Thrust Measurements (day 68)
- FTC Rocket and deployment mechanism (day 69)
- First FTC flight tests (day 71)
- Polaron VIb flights and other crashes (day 73)
- Flour Rockets (day 74)
- DetMech - Parachute Detachment Mechanism
- Acceleron V baseplate and staging mechanism tests
- Acceleron V first flight (day 78)
- High speed video (day 78)
- NSWRA pyro rocket highlights (day 78)
- Acceleron Vb Explosion (day 79 - part 1)
- Day 79 highlights - Axion V (day 79 - part 2)
- Gardena Nozzle construction (Part 1)
- Gardena Nozzle construction (Part 2) - Launcher fix
- A Different Perspective & highlights (day 80)
- Baking Soda and Vinegar Rocket (day 81)
- Inflight Water behaviour (day 82)
- Asymmetric splice burst test (day 82)
- Highlights from day 83
- Acceleron V - Pressure switch tests (day 84)
- MicroLab - Mercury Switch Experiments (day85)
- In-line Parachute Deployment Mechanism (day86)
- Acceleron V components and Day 87 highlights
- Dual Deployment Mechanism (day 88)
- Day 89 Highlights, Axion IVb (day 89)
- Acceleron V and Axion IVb to 810' (day 90)
- Day 92 Highlights, fiberglass flights (day92)
- Polaron G1 and Parachute cam (day93)
- Mk 3 stager flight test highlights (day94)
- Mk 3 Construction Tutorial Part - 1
- Mk 3 Construction Tutorial Part - 2
- Parraweena Highlights (day95)
- Day 96 - 2 stage flight highlights. (day96)
- Acceleron V to 864' highlights (day97)
- Day 98 - Highlights (day98)
- Polaron G2 Nosecone test Flights (day99)
- Polaron G2 First Flight (day 100)
- Bottle Splicing - Asymmetric splice #5 - Tutorial
- Day 101 - Foam flight highlights (day 101)
- Servo Timer II Operation
- Servo Timer II test flights (day102)
- Polaron G2b CATO (day 103)
- Quick Launcher, HD onboard video (day 104)
- Polaron G2 and Axion G2 flights (day 105)
- Measuring Bottle Stretch Thrust (day 106)
- N2000 Drag Race - Williams
- Day 107 Highlights
- Pan Cam - A different perspective (day 108)
- Polaron G2 flights (day 109)
- Williams 2011 Saturday highlights
- Williams 2011 Sunday highlights
- Polaron G2 - Static thrust tests (day 110)
- HD Cam flights (day 111)
- Looking up (day112)
- Alternative Fuels (day113)
- Reefing Parachutes (day114)
- Shadow flights (day115)
- Casual Flights (day 116)
- Water and Pyro (day117)
- Polaron G2 flight (day118)
- Day 119 Highlights
- ARB flights (day120)
- Shadow II Flights (day121)
- Chase cam (day 124)
- Boom cam (day 124)
- Day 125 Highlights - long rocket (day 125)
- Hat-trick (day 126)
- Launch Procedure (day 126)
- Day 126 Highlights
- Shadow II flight (day 129)
- Inverter first flight (day 129)
- Shadow II CATO (day 130)
- Inverter successful flight (day 130)
- Materials Challenge (day 131)
- Painting the sky (day132)
- Day 132 highlights

Diagrams

- 7mm and 9mm CD Nozzles
- Launch Sound Analysis
- Acceleron II details
- Jet Foaming arrangement in rocket
- Polaron Deploy mechanism
- Robinson Coupling
- Flight Computer V1.2 circuit diagram
- Flight Computer V1.3 circuit diagram
- Flight Computer V1.3.1 circuit diagram
- Flight Computer V1.3.2 circuit diagram
- Flight Computer V1.4 circuit diagram
- Tachyon sustainer detail
- Removable fin assembly
- Acceleron launcher nozzle seat detail
- Acceleron IIIb detail
- Graviton detail
- Simple pressure switch
- VISE Glue viscosity test
- Reinforcing Bottles
- Katz Stager
- Polaron IV Air Supply Schematic
- Polaron IV rocket detail
- Polaron IV guide rail details
- Tornado Coupling
- FTC End-cap and Nozzle
- Drop Away Boosters - Passive Separation
- Variable Nozzle
- Load Cell Amplifier circuit diagram
- Thrust measurement bottle configuration
- RCA plug based G-switch
- Corriflute fin attachment cross-section
- Splice cross-sections
- Pressure switch (PS3)
- In-line parachute deployment mechanism
- Mk 3 staging mechanism
- Polaron G2 Size comparison
- Jet Foaming Spacer

 



Copyright © 2006-2013 Air Command Water Rockets

Total page hits since 1 Aug 2006:

George Katz - Google Plus